Drawing |
Description |
Relevant to: |
Infrastructure Responsibility Matrix |
All |
|
On-Lot Infrastructure Installation Set Out Details |
Developer |
|
Typical Valve Installation - Isolation Valves |
Developer |
|
Standard Isolation Valve - Name Plates |
Developer |
|
Standard Property Boundary Assembly - Irrigation |
Developer |
|
Standard Air Valve Details - Above Ground |
Developer |
|
Standard Air Valve Details - Below Ground |
Developer |
|
Standard Flushing Points Details - Small Mains |
Developer |
|
Standard Flushing Points Details - Large Mains |
Developer |
|
Typical Branch Connection Details |
Developer |
|
Infrastructure Staging Diagram – Tank in Front of Property |
Developer, Builder and Flow |
|
Infrastructure Staging Diagram – Tank in Rear of Property |
Developer, Builder and Flow |
|
Property Boundary Assembly |
Developer |
|
Wastewater Collection Tank Installation Requirements |
Developer |
|
Not-Standard Lot - Retaining Walls |
Developer |
|
Non-Standard Lot – Tank in Batter / Slope |
Developer |
|
Property Sewer Servicing Guidelines - Reduced Area Lots |
Developer |
|
Property Sewer Servicing Guidelines - Non Standard Super Lot |
Developer |
|
MAN-EONE-C |
E One Tank Installation Manual (civil) |
Developer, Builder, and Plumber |
Dual Water Reticulation - Single property services |
Developer, Builder, and Plumber |
|
Dual Water Reticulation - Split property services |
Developer, Builder, and Plumber |